Project Process

Sediroglu Group manages flour and feed mill projects through a structured, engineering-driven process designed to ensure operational reliability, predictable timelines, and long-term industrial performance. With 15 dedicated project engineers, we handle every phase from initial planning to commissioning under a controlled and systematic framework.
More Information More Information

Technical Evaluation & Project Planning

The process begins with:

  • Capacity analysis
  • Raw material assessment
  • Customer layout requirements
  • Site condition evaluation

We provide:

  • 2D and 3D project drawings
  • Detailed layout plans
  • Energy consumption calculations
  • Technical feasibility analysis

Our engineering team ensures that each project is optimized for efficiency, safety, and long-term productivity.


Commercial Structuring

The commercial flow follows a clear structure:

Proforma → Contract → Production

Advance payment is required to initiate production.
For large-scale turnkey projects, milestone-based progress payments may be applied.

This system ensures financial clarity and structured production scheduling.


In-House Manufacturing

All machinery is manufactured entirely within our own production facility.

We do not outsource core machinery production. Only consumable components are externally sourced where necessary.

Each production stage undergoes internal quality control procedures to ensure compliance with technical specifications and international standards.


Installation & Commissioning

Installation is carried out exclusively by Sediroglu Group’s own engineers.

Installation timelines:

  • Individual machine installations: approximately 1 week
  • Large turnkey factory projects: 3 to 6 months depending on scale

Following mechanical installation, commissioning and performance testing are completed on-site.

Operator training is provided to ensure smooth and independent plant operation.


Capacity Range & Project Scale

Sediroglu Group provides solutions for a wide production range:

  • Minimum flour mill capacity: 45 tons per 24 hours
  • Maximum flour mill capacity: 600 tons per 24 hours

We are capable of simultaneously managing:

  • Up to 3 large-scale turnkey projects
  • Up to 8 smaller-scale projects

This capacity ensures production continuity without operational bottlenecks.


After-Sales & Operational Support

The warranty period begins from the official commissioning date.

We provide:

  • Remote technical support
  • Spare parts planning
  • Long-term operational assistance

Our project process does not end with installation — it continues with structured technical support and performance sustainability.


Turnkey or Machinery Supply

Sediroglu Group offers both:

  • Individual machinery supply
  • Complete turnkey factory solutions

Each project is engineered according to the customer’s production goals, facility conditions, and investment strategy.


Engineering-Focused Project Management

Our structured approach guarantees:

  • Technical precision
  • Controlled timelines
  • Budget transparency
  • On-site operational readiness
  • Long-term reliability

Sediroglu Group delivers not only machinery, but fully engineered industrial systems managed through a disciplined project framework.